Book Now

Do you need an Independent Building Inspector to oversee the construction of your new dwelling?

Did you know that your private certifier (Council) does not inspect workmanship or defects during the construction period of your new home ?

The stage inspections are to make sure that your new dwelling is being built to the required plans and specification and workmanship, and to identify any defects that may arise through the construction period.

MBA Building Inspections is an Independent Building Inspector overseeing the construction of your new dwelling. There are a total of 8 inspections stages over the construction period.

  • Stage 1 – Overviewing the plans and specifications
  • Stage 2 - The setting out of the house on the block of land.
  • Stage 3 – Footings and floor construction
  • Stage 4 – Frames and roof
  • Stage 5 – Lock up
  • Stage 6 – Completion of the plaster
  • Stage 7 – Fix out
  • Stage 8 – Final Hand Over

With all inspections we liase with the builder and the site foreman.

Note: You can choose which independent inspections you would like us to carry out .

  • HANDOVER INSPECTION REPORT

    MBA's handover inspection report is designed to give you peace of mind that the property in question has been built to industry standards.

    The report will ensure adherence to the appropriate building standards and recommend any rectifications which may be required to meet these standards.

  • 575 Nagle Road, Lavington NSW 2641

In Compliance With
  • The Building Code of Australia
  • State, Federal and Local Government Building Standards
  • National Code of Practice for the Construction Industry
  • Australian Standards AS 4349.0, AS 4349.1, AS 4349.3
Why Choose Us?
  • 40 Years Experience
  • Variety of Inspection Types
  • Understandable Reports
  • Fast Turnaround
  • Local Inspectors
  • Family Owned Business
Proud Supporter